Swing Rebuild – Phase 3-4
Connection & Integration
Day 1 — Connection / Anti-Flip
3 Sets
- 8/side Cable chest press with rotation (2)
- 12 Band pull-aparts w/ 1-2 sec pause (blue)
3 Sets
- 8/side Med ball rotational pass (15)
- 6/side Renegade rows (40-40-45s)
2 Sets
- 8/side 5 sec Pallof press hold (2 cable)
- 10 Hammer curl (30-35s)
I’ll get in my golf practice later today.